how to switch a task from one task to another task using context switching(CSA)

Tip / Sign in to post questions, reply, level up, and achieve exciting badges. Know more

cross mob
Uma
Level 1
Level 1
5 questions asked 5 sign-ins First reply posted

Dear Team,

I'm trying  switch a Task where i updated all required information in CSA and updated A11 register with function address(task address). updating function address is not entering into  at task. Please let me know what shall be done achieve the task switching without using Jump instructions.

thanks in advance!!

 

Regards,

Uma

 

0 Likes
1 Solution
Di_W
Moderator
Moderator
Moderator
500 solutions authored 1000 replies posted 250 solutions authored

Hi Uma,

If you are migrating ROTS, you could refer to application note "Integration of ERIKA OS to TC3xx Base Templates For TC3xx BIFACES Base Template Projects" which you can get from myICP if you have account  and access rights. The source is in BaseProjects_TC3xx_V1_0_1_13_0_Package.zip

 

dw

View solution in original post

0 Likes
1 Reply
Di_W
Moderator
Moderator
Moderator
500 solutions authored 1000 replies posted 250 solutions authored

Hi Uma,

If you are migrating ROTS, you could refer to application note "Integration of ERIKA OS to TC3xx Base Templates For TC3xx BIFACES Base Template Projects" which you can get from myICP if you have account  and access rights. The source is in BaseProjects_TC3xx_V1_0_1_13_0_Package.zip

 

dw

0 Likes